Commercial pools are more than amenities. For hotels, resorts, gyms, apartment complexes, and recreational centers, they’re part of the brand. Building one requires more than just a hole in the ground — it demands a comprehensive, coordinated design-build process. In Mesa, where the climate is hot and the expectations are high, every detail matters.
This guide walks you through the entire Commercial Swimming Pool Construction process from concept to completion. Whether you’re renovating an outdated facility or building a brand-new aquatic space, this is what you need to know.
What Is Commercial Swimming Pool Construction?
Commercial Swimming Pool Construction refers to the end-to-end design and building process of pools that serve public, commercial, or shared residential spaces. These projects must meet strict safety codes, ADA compliance, local health regulations, and operational standards.
This type of construction involves a coordinated effort between designers, engineers, contractors, and regulatory agencies. It also requires strategic planning, budgeting, and timelines to avoid costly delays.
Phase 1: Pre-Construction Planning and Feasibility
Before design begins, the project starts with:
- Site evaluation: Soil condition, slope, drainage, sun exposure, and space are assessed.
- Budget planning: A clear budget range is set based on intended size, features, and use.
- Zoning and compliance checks: Local code requirements, including fencing, depth markers, and ADA access, are reviewed.
- Permit research: Understanding permits required in Mesa and how long approval will take is essential.
This phase sets the tone for everything that follows and prevents delays down the road.
Phase 2: Pool Design and Engineering
Design includes both the visual style and the structural needs. It’s where form meets function.
- Concept drawings: Layouts show pool shape, deck space, equipment rooms, and adjacent amenities.
- Mechanical and electrical planning: Plumbing lines, pumps, filters, lighting, and heating systems are mapped.
- Material selection: Finish type (tile, plaster, aggregate), deck coatings, fencing, and accessories are selected.
- Safety and ADA features: Lifts, ramps, rails, and non-slip surfaces are integrated into the design.
Engineers ensure your pool design is structurally sound and meets Mesa’s building codes.
Phase 3: Permitting and Approvals
Mesa requires specific permits for Commercial Swimming Pool Construction, including:
- Building permits for structural work
- Electrical and plumbing permits
- Environmental or drainage permits, depending on the site
Inspections are scheduled at various stages, including pre-pour, plumbing rough-ins, electrical setup, and final walkthrough. A good contractor handles these approvals and coordinates inspections.
Phase 4: Excavation and Structural Work
Once permits are secured:
- Excavation begins based on pool layout and depth.
- Forming and rebar: Steel reinforcement is placed to support the shell.
- Plumbing and conduit lines are laid out for jets, returns, skimmers, lighting, and filtration systems.
- Gunite or shotcrete application: This material forms the solid pool shell and is cured over several days.
This structural phase is critical to long-term durability.
Phase 5: Decking, Tile, and Surface Finishes
After curing:
- Waterproofing and tile are installed inside the pool.
- Pool plaster or aggregate finish is applied.
- Decking and coping: Concrete, pavers, or decorative overlays are poured and finished.
- Fencing, gates, and drainage systems are added to meet safety codes.
Everything is measured for safety, comfort, and visual consistency.
Phase 6: Equipment Installation and Setup
At this stage, the pool’s mechanical systems are installed:
- Pumps and filters: The circulation system is connected and pressure-tested.
- Heaters or solar systems, if applicable, are installed.
- Automation and control systems: Timers, chemical feeders, and remote monitoring equipment are programmed.
Technicians ensure systems are balanced, efficient, and ready for commercial use.
Phase 7: Final Inspections, Training, and Opening
Before the pool opens:
- Health and safety inspections are conducted.
- Water balance and sanitation levels are tested.
- Staff training is offered on pool operation, cleaning routines, safety protocols, and emergency shutoffs.
Only after passing all inspections is the facility cleared for opening.
Why a Design-Build Approach Works Best for Commercial Projects
In Commercial Swimming Pool Construction, design-build firms manage the entire process. This reduces errors, shortens timelines, and creates smoother coordination. It also ensures that what gets designed can be built without major changes or delays.
Apricity Pools provides full design-build services in Mesa, guiding commercial property owners from vision to execution with total project oversight.
Common Features Included in Commercial Pool Builds
Each project is unique, but many include:
- Zero-entry areas for accessibility
- Lap lanes or swim zones
- Water features like fountains or waterfalls
- LED lighting systems for evening use
- Shade structures and seating zones
- Custom branding or tile inlays
How Long Does Commercial Swimming Pool Construction Take?
The average project timeline is 4 to 8 months. This varies depending on:
- Permit approval times
- Project size and features
- Site access and preparation
- Weather delays (especially during monsoon season in Mesa)
What to Look for in a Mesa-Based Commercial Pool Contractor
- Proven track record with commercial swimming pool construction
- Local permitting and code expertise
- Licensed, insured, and safety-certified
- Transparent timelines and budget updates
- Design-build capabilities for full project support
Apricity Pools is known for delivering on time and within budget across Mesa’s commercial pool projects.
Partner With a Team That Understands Commercial Pool Construction
When you’re investing in a commercial pool, cutting corners is not an option. Whether you’re building from scratch or upgrading an outdated space, the process needs to be precise and professional.
With deep experience in commercial swimming pool construction, Apricity Pools delivers start-to-finish excellence to properties across Mesa. We help you plan smarter, build better, and open faster — with a pool that performs beautifully for years to come.
Frequently Asked Questions
How much does commercial pool construction cost in Mesa?
The cost of commercial pools can vary greatly depending on their size, features, and the materials used. These factors play a crucial role in determining the overall investment required for the project.
Do I need a separate designer and builder?
Not with a design-build team like Apricity Pools. We handle everything from plans to permits to construction.
What’s the biggest delay in commercial pool construction?
Permit approvals and weather delays are the most common reasons for extended timelines.
Can I renovate an old commercial pool instead of rebuilding it?
Yes, if the structure is sound. A resurfacing and equipment upgrade can modernize your space without full demolition.
What’s the best time of year to build a commercial pool in Mesa?
Fall and early winter offer optimal conditions, avoiding summer heat and the spring rush for permits.